Spent a week or so assessing what needs to be done to the car to get it ready for spring, and I've gotten a decent start. Interior has been gutted, everything but the dash basically. Ran wiring for the rear speakers and amplifier. The rear deck was cut out when I bought it so I mocked up a new one with a pair of 6×9s to see how it looks. Will have to weld in a new deck eventually. I will also be replacing weather stripping all the way around, doing some front suspension work, and updating the wheels/tires. Installed voltmeter, oil pressure and temperature gauges, still trying to figure out where the tachometer will go. I'm planning on this being a 4 month project to get it where I want.
And for those curious... 1979 Malibu Classic, 2 Door, White with an '83 front clip. 350ci, Edelbrock carb/intake, built TH350 with shift kit/stall, 4.11 gears, hooker headers, dual exhaust.
Any other questions or comments just let me know. Still working on getting pictures so bear with me lol.