I will use this thread to document the reassembly of the 1970 Cutlass S I bought from a buddy two years ago (in my sig). It's starting to get real with some new parts to put the 403 back together.
New replacement piston
Old vs new
Full Fel-Pro gasket set (I know, throw half of it away)
Going into this 403 to bring it back to life
Cylinder is good enough for a hone and new rings (still waiting on the Hastings one cyl ring pack). I will clean everything thoroughly and reassemble.
403 with #6 heads (head bolt holes enlarged), JM-20-22 cam, 1-3/4" primary headers, Performer intake and worked Q-Jet carb (Dean-o). Should be decent in the '70.
I hope to get the engine back together in a coupla weekends (as soon as I get the ring pack).
New replacement piston
Old vs new
Full Fel-Pro gasket set (I know, throw half of it away)
Going into this 403 to bring it back to life
Cylinder is good enough for a hone and new rings (still waiting on the Hastings one cyl ring pack). I will clean everything thoroughly and reassemble.
403 with #6 heads (head bolt holes enlarged), JM-20-22 cam, 1-3/4" primary headers, Performer intake and worked Q-Jet carb (Dean-o). Should be decent in the '70.
I hope to get the engine back together in a coupla weekends (as soon as I get the ring pack).