well the end of a dirt track racing season means time for improvements one one of the first on my list is going to be replacing the drivers side floor from front firewall to rear firewall with 16 gauge sheet metal. the stock floor is rotted and patches were rivetted over the holes from the previous owner. so ill be cutting it out tonight. hopefully getting the metal later this week and starting with the cardboard templates. ill post some pictures for u guys