Right side has shock installed, spring installed, and the spindle is pinned.
Ready for new rotors, painted dust shield, new calipers and pads. Fish through the new water gauge and oil pressure gauge wiring, install the grommet and replace the wheel well.
Remove the stabilizer bar, paint it replace it with new bushings and links. Hook up the tie rods. Put on the wheels.Drive.
Ready for new rotors, painted dust shield, new calipers and pads. Fish through the new water gauge and oil pressure gauge wiring, install the grommet and replace the wheel well.
Remove the stabilizer bar, paint it replace it with new bushings and links. Hook up the tie rods. Put on the wheels.Drive.