sbc direct port system plumbing

Status
Not open for further replies.

84sbcregal23deg

Apprentice
Jan 6, 2011
98
0
0
Long island, NY
so i had at it for the first time plumbing a fogger system for my 18 degree set-up. overall pretty happy with the way it came out, but am probably gonna flip the fuel blocks upside-down to get the solenoids lower, and make 2 or 3 new lines. the stainless lines are incredibly hard to work with, but buying the right bender made it a lot easier. now i know why inductions solutions gets so much money to do this!
 

Attachments

  • regal parts 039.jpg
    regal parts 039.jpg
    84.3 KB · Views: 240

84sbcregal23deg

Apprentice
Jan 6, 2011
98
0
0
Long island, NY
probably have 5-6 hours into it (not including welding the bungs into the runners and tapping them). car is eventually getting a plate too, so trying to plan ahead and leave room, but still have it look neat. winds up being a lot going on in one place.
 
Status
Not open for further replies.

GBodyForum is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to amazon.com. Amazon, the Amazon logo, AmazonSupply, and the AmazonSupply logo are trademarks of Amazon.com, Inc. or its affiliates.

Please support GBodyForum Sponsors

Classic Truck Consoles Dixie Restoration Depot UMI Performance

Contact [email protected] for info on becoming a sponsor