got the wiring and such for the valves all cleaned up and loomed. got the power, ground and switched ign into the trunk for the p/switch, and relay for the compressors. the compressors, tank, gauges and switch box are installed temporarily until i can get the money together for the sheet metal in the trunk and get the time to glass the radio panel to hold the gauges as well as the radio. I noticed at lift in the back the tires rub the frame so I had to cut the frame out and plate it. I was able to drive it a couple of blocks in my development tonight, without and problems. It is coming to an end, thank god! enjoy...
filled with dirt...
from the inside of the frame
filled with dirt...
from the inside of the frame