Well I officially want to start a build Thread.
Just to document the progress and well of course talk things through and share information. With my expierences and others. My first post was in the body section about the biggest patch panel ever. I cut out the entire floor from a cutlass stripped it down and kept the inner rockers, body mount boxes, floor extensions and the pans. Ive since cleaned and built a paint booth. Spray epoxy primer on the new floor
Im thinking about using Eastwood 2k ceramic chassis black for my top coat for the underbody, frame and inside of car. Anyways ive been working on the frame now. I sanded and wire wheeled after sandblasting. I am now working on the Body mount repair washers. I Have TRZ Solid body mounts that fit nicely on the new repaired sections
I have 3 of 4 done that are shot. Hopefully knock the last one out tonight. Then im going to temp brace rear frame horns and cut out upper and lower Torque boxes replace with Team Z boxes. Thats next. After that box up frame C channels. And tig weld 25.5 Trick chassis floor bars. So more pics to come.
Im thinking about using Eastwood 2k ceramic chassis black for my top coat for the underbody, frame and inside of car. Anyways ive been working on the frame now. I sanded and wire wheeled after sandblasting. I am now working on the Body mount repair washers. I Have TRZ Solid body mounts that fit nicely on the new repaired sections
I have 3 of 4 done that are shot. Hopefully knock the last one out tonight. Then im going to temp brace rear frame horns and cut out upper and lower Torque boxes replace with Team Z boxes. Thats next. After that box up frame C channels. And tig weld 25.5 Trick chassis floor bars. So more pics to come.
Attachments
Last edited: