3rd chapter of the Compound / Prison Planet saga...

Specs: 36X48 plus 12X36 lean-to addition, 4/12 pitch. 13'6" walls to accommodate 12' single roll-up door. All windows, skylights, and clear fiberglass panels omitted both for privacy and security reasons. Insulated wrap between framing and sheeting. 6" slab with 2'X3' footers under main bay for hoist support. Plumbing stubbed to add bathroom at later date. Basic 200A service with 220V drops.

I will be providing the lighting and will likely add sheetrock and additional insulation later. Eventually a bathroom with a shower too in order to accommodate the RV spot where the manufactured home used to be.

Construction began 1/29/2020...











These guys move really fast and even work weekends. Buildings like this is their specialty and the contractor owns the truss company and the crane. Pretty well vertically integrated. If they didn't have to wait on building inspections, they could probably pound this out in three days.



Updates as they unfold. There may be some overlap with the Prison Planet thread but it'll be closed once this building gets put to work.
 
  • Like
  • Winner
  • Love
Reactions: 19 users

ssn696

Living in the Past
Supporting Member
Jul 19, 2009
5,543
6,662
113
Permanent Temporary
Wow! From "I dunno about borrowing to build a shop" to "Wha-bam: SHOP". Head spinning yet?
 
  • Like
  • Agree
Reactions: 6 users

TURNA

Rocket Powered Basset Hound
Jul 24, 2009
10,941
19,990
113
Socialist NY
Sweet!
 
  • Agree
Reactions: 2 users

ssn696

Living in the Past
Supporting Member
Jul 19, 2009
5,543
6,662
113
Permanent Temporary
Yes. Commit and dive in. Regret nothing.
Choose 'full enchilada'. If you're gonna build a small-block, start with a 400....
 
  • Like
Reactions: 3 users

Texas82GP

Just-a-worm
Apr 3, 2015
7,981
18,676
113
Spring, Texas
I have shop envy.
 
  • Like
  • Agree
Reactions: 11 users

B's 87mcss

Greasemonkey
Dec 19, 2018
138
469
63
Sherwood Park, Alberta, Canada
Looks Great, fast progress! Couple things I did right on my shop regarding wiring, consider upgrading to 12 gauge wire/20 amp service to all your plugs. A cut off saw takes 15 amps and will invariably kick out the breaker right when you are half way thru a cut. 20 amp you can run just about anything. Also, you'll like the couple extra 220/240V plugs, one for sure by the overhead door so you can weld/cut outside. The last thing is put a RV plug on the outside of the building so your guests can hook up the RV and enjoy some a/c. Just my 5 cents worth (we don't have pennies in Canada any more so we had to inflate our worth by 3 cents)
 
  • Like
  • Agree
Reactions: 6 users

axisg

Comic Book Super Hero
Jul 17, 2007
2,685
2,354
113
YYZ
I have crane and shop envy LOL. That flatdeck and crane ( or one like it ) is likely going to be our next purchase

Very nice sir.... carry on !
 
  • Like
Reactions: 2 users

DRIVEN

Geezer
Apr 25, 2009
8,062
14,479
113
*CENSORED*
Looks Great, fast progress! Couple things I did right on my shop regarding wiring, consider upgrading to 12 gauge wire/20 amp service to all your plugs. A cut off saw takes 15 amps and will invariably kick out the breaker right when you are half way thru a cut. 20 amp you can run just about anything. Also, you'll like the couple extra 220/240V plugs, one for sure by the overhead door so you can weld/cut outside. The last thing is put a RV plug on the outside of the building so your guests can hook up the RV and enjoy some a/c. Just my 5 cents worth (we don't have pennies in Canada any more so we had to inflate our worth by 3 cents)

All good suggestions. I'll run the 20A idea past the electrician and get his thought. But, really, I can't think of any of my tools that are that power thirsty. I used to use a 110V welder that would pop a breaker if it shared the circuit with my big space heater but they're both long gone now. I'll definitely drop the 220V by the roll up door though.
As for the RV power, the RV pad will be where the single wide used to be. Water, septic and power are already right there. They're going to trench power from the pole to the shop. The bathroom will be in the corner closest in the doodle photo so I'll trench over to tie into the water and septic. It's an older pic and it's bordered by railroad ties now. When the shop is done I'll bring in some road mix and smooth it out.
My septic tank would be at 9:00 and about 50' out of the frame. My well is at 4:00 and about 60' away. Irrigation canal directly behind.
20200203_163340.jpg
 
  • Like
Reactions: 4 users

GBodyForum is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to amazon.com. Amazon, the Amazon logo, AmazonSupply, and the AmazonSupply logo are trademarks of Amazon.com, Inc. or its affiliates.

Please support GBodyForum Sponsors

Classic Truck Consoles Dixie Restoration Depot UMI Performance

Contact [email protected] for info on becoming a sponsor