I've primarily been on this particular project for 1-1/2 years now. The north link of the light rail project in the Seattle metropolitan area. The majority of the major digging portion is complete, and structures are going up, and beginning some backfilling in places. It's actually looking like progress is taking place.
This is part of a bridge abutment that needs to be filled after they erect the other wall parallel to the edge of the freeway (Interstate 5). Today's goal was to get to the level of the pink paint marks.
Last week, the ground level here was about 8-10 feet lower. I worked this backfill for 2 days (Thursday-Friday last week), then on different pieces of this same project this week, while two of our drivers filled most of this.
I was on stand-by for a few minutes today while the roller compacted the fill before I backed in again.
This is part of a bridge abutment that needs to be filled after they erect the other wall parallel to the edge of the freeway (Interstate 5). Today's goal was to get to the level of the pink paint marks.
Last week, the ground level here was about 8-10 feet lower. I worked this backfill for 2 days (Thursday-Friday last week), then on different pieces of this same project this week, while two of our drivers filled most of this.
I was on stand-by for a few minutes today while the roller compacted the fill before I backed in again.