This trailer was thirsty. 2 coats in most places and used an entire quart. Got the trailer on the the wheels and the boards will go on tomorrow.
Been busy with the house. House wrap, roofing underlayment, windows, and doors are on/in. About halfway through the electrical and have the topside of the waste plumbing/vents in. Installed our giant bathtub and came to the conclusion that I'll have to run two water heaters. You can see some of the siding that got delivered this week sitting on what will someday be the yard. Lots of work left!View attachment 112306View attachment 112307View attachment 112308
Trailer looks really good. I'm a little concerned about that that stubby tongue though. Watch your bumper in the turns, especially backing up.
Looks largely the same from the outside. Pretty much done with the plumbing rough, electrical is getting close too. Going to drop the well pump here in a bit, chase a plumbing leak, do a little siding, and roofing steel shows up today. HVAC is becoming the main priority soon.
Nah, that's too fancy/expensive. The profile of the stuff I got is pro panel. Even then it was over 10k in materials.Standing seam metal, I presume..
GBodyForum is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to amazon.com. Amazon, the Amazon logo, AmazonSupply, and the AmazonSupply logo are trademarks of Amazon.com, Inc. or its affiliates.