Did more damn house work.
Moved concrete front steps to tile house. Didn't have machine with the power to move it back. Decide to build new steps. $50 into a rental, $25 for a hammer bit, and $30 into dump fees. The worst part is running the hammer. At least its done.
Rent demo hammer and go to town for about 5 hours
Til yard with 50 year old tiller to mix in the clay blobs and try to get rid of all the (pigeon, crab & quack) grass.
Load concrete onto trailer and make 3 trips to the landscaping place and dump it.
Moved concrete front steps to tile house. Didn't have machine with the power to move it back. Decide to build new steps. $50 into a rental, $25 for a hammer bit, and $30 into dump fees. The worst part is running the hammer. At least its done.
Rent demo hammer and go to town for about 5 hours
Til yard with 50 year old tiller to mix in the clay blobs and try to get rid of all the (pigeon, crab & quack) grass.
Load concrete onto trailer and make 3 trips to the landscaping place and dump it.