Blew off the dust on the rims and got new tires.
Shined up the center caps, inserts & trim rings.
Mounted the tires.
Put the Cutlass back on the ground with new shoes after being up on stands since '03.
Three pumps and started.
Rolled up and down the driveway to check the brakes, self-adjust the rears and then check the e-brake.
Pulled back into the garage.
Shut down and sat in the car for awhile and just pondered......
Next week:
Alinement.
Pull the chrome and trim off.
Get ready for the winter shining project. Need something to do when it is doing the s-word outside.
Cover the '02 Monte and the HD.
Get ready for the hibernation............
Shined up the center caps, inserts & trim rings.
Mounted the tires.
Put the Cutlass back on the ground with new shoes after being up on stands since '03.
Three pumps and started.
Rolled up and down the driveway to check the brakes, self-adjust the rears and then check the e-brake.
Pulled back into the garage.
Shut down and sat in the car for awhile and just pondered......
Next week:
Alinement.
Pull the chrome and trim off.
Get ready for the winter shining project. Need something to do when it is doing the s-word outside.
Cover the '02 Monte and the HD.
Get ready for the hibernation............